Hi,
Re: Analysis Office 1.4, this product is in the final phases of “customer evaluation” (i.e. pre-Ramp Up testing) and has another ~1 week to run.
If the quality gate checks are passed, then a ramp-up won’t be necessary, and could go General Availability with 1.4 SP00.
We should know more by the end of this week. If criteria are not satisfied, then we could be looking at a quick RU phase.
Please note that some interoperability features with BIPlatform do require BI4.1 (currently starting ramp up for 3-6months)
Regards,
H